In today’s complex construction environment, coordination failures are costly. Taft Electric’s VDC team — built around our BIM modeling and coordination capability — eliminates conflicts before they reach the field, reducing RFIs, accelerating schedules, and protecting budgets.
Working directly within the project model, our BIM-trained professionals collaborate with architects, engineers, and trade partners to produce fully coordinated power, lighting, and low-voltage systems from the earliest design phases.
Our VDC team models with fabrication in mind from day one. The same model used for coordination flows directly into spool sheets and shop drawings — eliminating the translation step where most field errors originate.